My Spitfire Project

My Spitfire Project History
Detail on longeron and how is attached to the fron...
Detail on longeron and how is attached to the fron...
Detail on longeron and how is attached to the fron...
Detail on longeron and how is attached to the fron...
View to the rear of the fuselage and how the longe...
View to the rear of the fuselage and how the longe...
The engine crate is being welded at the Newport Mo...
The engine crate is being welded at the Newport Mo...
The crate is assembled and tack, ready to be welde...
The crate is assembled and tack, ready to be welde...
Welding finished, crate ready to be put in the kil...
Welding finished, crate ready to be put in the kil...
This is the first half of my new hangar. It will b...
This is the first half of my new hangar. It will b...
Second half of the portable class is fitted....
Second half of the portable class is fitted....
Front wall has to be removed and the steel truss f...
Front wall has to be removed and the steel truss f...
The hangar door assembly....
The hangar door assembly....
Now, I can call it the hangar, located on Tottenha...
Now, I can call it the hangar, located on Tottenha...
Al from Savage Aircrafts which they built the hang...
Al from Savage Aircrafts which they built the hang...
[1] [2] [3] [4] [5] [6] [7] [8] [9]

Select Category